Kick-Off Presentation · DD Month YYYY

  1. 01 Basic Information 03 – 18
    • 1.1 Introduction & Key Dates
    • 1.2 Brand Mixed Layout & Store Location
    • 1.3 Site Photo
  2. 02 Base Drawings & Site Details 19 – 42
    • 2.1 3D View
    • 2.2 Interior Layout (1F / 2F / 3F)
    • 2.3 External Facade
    • 2.4 Staircase & Lift Study
    • 2.5 Space Information from Local Team
  3. 03 Design Guideline Summary 43 – 45
    • 3.1 Shop Interior Guidelines
    • 3.2 External Facade Guidelines
  4. 04 Appendix 46
    • 4.1 Material Flame Rating
01

Basic Information

  • 1.1 Introduction & Key Dates
  • 1.2 Brand Mixed Layout & Store Location
  • 1.3 Site Photo

Project Overview

Store Name
Address
Total Area
— ㎡
Floors

Key Dates & Milestones

Q3 2023
Store Committee
Q4 2023
Design Freeze
Q1 2024
Construction Start
Q3 2024
Grand Opening

Store Location & Traffic Flow

Site plan with brand mix overlay. Key neighbouring brands and traffic flow direction annotated on the map.

  • Main pedestrian flow from north entrance
  • Adjacent luxury zone: Gucci, Hermès, Dior
  • Vehicle drop-off point on east side

Site Photography — Exterior

Additional pages: interior photos, lift area, reference competitor facades (14 pages in this section). Each page: ≤4 large images + short captions.

02

Base Drawings & Site Details

  • 2.1 3D View
  • 2.2 Interior Layout
  • 2.3 External Facade
  • 2.4 Staircase & Lift Study

3D Axonometric / Section Overview

1F Layout — Key Annotations

  • Main entrance — double door, clear width ≥ 1800mm
  • Display zone — open floor, no structural obstructions
  • Cash wrap — located at rear centre, sightline from entrance
  • BOH access — service corridor to stockroom & lift

Additional pages: 2F Layout + 3F Layout + Evacuation Distance Calculation (3 pages). Each floor plan split into single page with ≤4 annotations.

Facade Sections & Dimensions

Rescue window requirements, opening dimensions, and signage zone marked on each elevation.

Staircase Option Comparison Matrix

Option Description Fire Compliance Space Impact Aesthetic Recommendation
A Existing Open Staircase Non-compliant Minimal — retains original opening High — open, transparent
B1 Blocked Circular Spiral Compliant Moderate — requires slab infill Medium — enclosed spiral
B2 Blocked Elliptic Spiral Compliant Moderate — larger footprint High — elegant ellipse ✓ Recommended
C Straight 1F–2F + Circular 2F–3F Compliant Large — two staircase zones Medium — mixed typology Fallback

Detail pages for each option (layout + structural drawings) follow in appendix. Lift study with dimension table on separate page.

03

Design Guideline Summary

  • 3.1 Shop Interior Guidelines
  • 3.2 External Facade Guidelines

Interior Design Guidelines — Key Points

  • Wall finishes: All perimeter walls to receive full-height gypsum lining, skim coat finish ready for SL VM system installation.
  • Floor loading: Display zone — min. 5.0 kN/m²; Stockroom — min. 7.5 kN/m².
  • Ceiling height: Clear height ≥ 3.0m finished floor to underside of slab; bulkhead zones as per SL ceiling plan.
  • Lighting: 3-circuit track system, DALI dimmable. Emergency lighting per local code.
  • MEP coordination: All services routed via BOH corridor; front-of-house to remain clear of visible services.

Split into 2 pages: Interior (A–E, G) and Interior (F, I) + External Facade. Each page ≤5 items.

External Facade Guidelines

  • Signage zone: Dedicated SL signage band at +3.0m to +3.8m above finished ground level. No tenant signage outside this zone.
  • Glazing: Low-iron laminated glass, min. 12mm + 1.52 PVB + 12mm. U-value ≤ 1.8 W/m²K.
  • Night visibility: Internal lighting to remain on until 23:00. Window display illumination ≥ 500 lux at merchandise plane.
04

Appendix

  • 4.1 Material Flame Rating

Material Flame Rating Schedule

Material Location Standard Rating Certification
Gypsum Board All interior walls GB 8624 Class A
Timber Veneer Display plinths GB 8624 Class B1 Fire retardant treatment cert.
Stainless Steel Fixtures & hardware GB 8624 Class A
Carpet Fitting rooms GB 8624 Class B1 Flame retardant cert.